What was visible, where, and under what access condition.
Buyer · seller · agent · property manager
The chimney report should support the property decision.
A sale or transfer changes the inspection circumstance. Plan the requested systems, accessible areas and deadline before anyone promises a visit or report.
- Decision
- Purchase / sale / transfer
- Systems
- Requested flues and appliances
- Access
- Roof · attic · crawl · basement
- Deadline
- Closing or contingency window
CIRCUMSTANCEScope still requires confirmation
NFPA 211 identifies sale or transfer of property as a Level II inspection circumstance. That does not define Chimney4u’s availability, price, report format, turnaround or third-party acceptance.
Technical basis ↗QUALIFY THE REQUEST
Give the team the transaction facts—not a vague “inspection” lead.
This prototype stores only the selected categories in the current browser session. It does not transmit a request, hold an appointment or collect a property address.
WHAT LEVEL II CHANGES
More accessible context.
Not concealed demolition.
Readily accessible chimney, flue, appliance and connection areas; obstruction and combustible-deposit observations for the inspected system.
- Accessible exterior and interior areas
- Accessible attic, crawl space and basement context
- Accessible appliance and chimney connection
- Image scanning of requested accessible flue/liner areas
- Size and suitability context for connected appliances
- Removal of permanently attached building components
- Every system or flue without a defined request
- Repair authorization or a repair price
- Lender, insurer or buyer acceptance
- A guarantee of future performance
A DECISION-USEFUL RECORD
One finding should never silently become a sales claim.
Exact Chimney4u report fields remain unverified. The production standard should keep these layers separate so a buyer, seller or agent can see what is known and what remains limited.
What the observations support, with technical basis and confidence.
What could not be inspected or remains unresolved.
Use, monitor, further evaluate or consider separately scoped repair.
DEADLINE WITHOUT FALSE URGENCY
The deadline is a routing fact—not a promise.
The selected band helps the team prioritize review and decide whether it can meet the transaction need. Only a person with current capacity can accept the requested window.
PRINT / SHARE
Before the chimney inspection.
Buyer, seller, agent or property manager; purchase, listing or transfer.
Fireplace, stove, insert, furnace/boiler vent, chimney and flue.
Property entry, attic, crawl space, basement, roof conditions and appliance access.
Previous inspections, repairs, chimney fires, roof work and appliance changes.
Contingency or closing band and who must receive the report.
Smoke, malfunction, fire, storm, seismic event or suspected gas/CO concern.
Independent preparation resource · No paid-link or referral requirement · Exact appointment and report terms must be confirmed with the provider.
READY TO ROUTE?
Start with the transaction context.
Owner-approved Level II product, technician qualification, report sample, requested-system policy, deadline capacity, price, cancellation terms, partner disclosures and two local cases are required before removing `noindex`.
Page ID P03 · version 0.1 · no live booking or report SLA